Sosnowski Residence


Projektbeschreibung:
Sited in a 1950's era dense neighborhood in Tempe, Arizona, the Sosnowski Residence takes the form of a courtyard house defined by three sandblasted 8-8-16 standard gray CMU walls at the main level and an exposed Virendeel truss at the upper level that ultimately characterizes the project.

The main level’s CMU walls define the major public spaces of the project, which include an outdoor courtyard, living room, dining room, kitchen, and koi garden. The public spaces are also flanked by the... +
Sited in a 1950's era dense neighborhood in Tempe, Arizona, the Sosnowski Residence takes the form of a courtyard house defined by three sandblasted 8-8-16 standard gray CMU walls at the main level and an exposed Virendeel truss at the upper level that ultimately characterizes the project.

The main level’s CMU walls define the major public spaces of the project, which include an outdoor courtyard, living room, dining room, kitchen, and koi garden. The public spaces are also flanked by the garage and guest bedrooms, in turn providing additional privacy from the street and the neighbors. The outdoor spaces maintain an open relationship to the residence by means of two 30’ wide expanses of operable sliding glass doors. The master suite resides in the Virendeel truss above. The integration of the courtyard and koi garden as an essential part to the daily experience enables the project to fully embrace the outdoor spaces of the front and back yards.



Project Data:

Designers:
Chen + Suchart Studio, LLC
Szu-Ping Patricia Chen Suchart and Thamarit Suchart

Structural Engineering/ Construction Company:
AED Structural Engineers, Inc. – Christopher J. Sosnowski, P.E.

Photography:
Bill Timmerman of Timmerman Photography
Chen + Suchart Studio, LLC

Graphics + Drawings:
Chen + Suchart Studio, LLC

Location: Tempe, Arizona, USA
Construction Area: 3,427 sf or 318.40 sqm
Project Year: 2004 - 2006

Major Materials: Polished concrete floors, Sand-blasted Standard Grey 8-8-16 CMU, CorTen metal flat seam interlocked exterior wall cladding, Trespa wall cladding, painted structural steel -


Anzeige


  • Projektbeteiligte

    bewegen maximieren

  • Projektdaten

    maximieren

    Baubeginn 2004
    Fertigstellung 2006
    Gebäudetyp Einfamilienhäuser
    Projektgröße
    Brutto-Grundfläche (BGF) 318 m2
    Projektadresse US-Tempe
  • Karte

    maximieren

  • Gewährleistung

    competitionline übernimmt keine Verantwortung für Fehler, Auslassungen, Unterbrechungen, Löschungen, Mängel oder Verzögerungen im Betrieb oder bei Übertragung von Inhalten. competitionline übernimmt keine Verantwortung für Einbußen oder Schäden, die aus der Verwendung der Internetseiten, aus der Verwendung von Nutzerinhalten oder von Inhalten Dritter, die aus den Internetseiten oder über den Service gepostet oder an Nutzer übertragen werden, oder aus Interaktionen zwischen Nutzer und Internetseiten (online oder offline) resultieren. Bitte lesen Sie hierzu unsere Nutzungsbedingungen.