loading
Diashow »
  • ES-08490 - 08397 Tordera / Pineda de Mar
  • Realisiertes Projekt

Wastewater Treatment Plant


Projektbeschreibung:
A wastewater treatment plant (WWTP) is a big territorial “filter" which roughly purifies water after urban use before returning it to the sea.
So we imagined that this image of "filter" could be the image of the treatment plant. A filter between spaces, a light filter, a filter between the landscape and an industrial image installation ...
The Alt Maresme WWTP project includes sewage sanitation system consisting of 3 different facilities and strategically located in the territory, the Pump... +
A wastewater treatment plant (WWTP) is a big territorial “filter" which roughly purifies water after urban use before returning it to the sea.
So we imagined that this image of "filter" could be the image of the treatment plant. A filter between spaces, a light filter, a filter between the landscape and an industrial image installation ...
The Alt Maresme WWTP project includes sewage sanitation system consisting of 3 different facilities and strategically located in the territory, the Pump Station (PS) at the mouth of the stream of Pineda, the Pretreatment (PT) in front the beach near a small cemetery, and the treatment of sludge and waters line, located in the former Montpalau’s quarry (WWTP).
The pumping station (PS) is conceived as a small-scale building and industrial-looking as it is coated all over it with a metal deployée.
The part built on the coast, the pretreatment station (PT), buries in the ground to assimilate in height partly to the nearby cemetery. The white finish and lack of openings to the outside makes the building look like an extension of the cemetery fence.
In contrast to the two smaller facilities, PS and PT, which respond directly to their urban environment, the WWTP plant, of sludge treatment, is located within the quarry and is conceived as an scenographic exercise with a single facade inserted in the landscape. The project seeks to use the construction of the WWTP to improve substantially the image of the old Montpalau quarry currently unused. The landscape component of the intervention must be an improvement in the perception of the forest and agricultural landscape of its surroundings. The search for the landscape quality of the new intervention does not arise from cosmetics, but from the generation of new premises for the landscape restoration of an old quarry and the very concept of the new facility.
The new environmental facility is organized by parallel strips separated by plant spaces in continuity with the forest. A large metal volume will house the visitor’s center and staff facilities. A large facade formed by metal filters frames the main volume and generates the only image we have of it from outside. (Built work Phase 1). -


Anzeige


  • Projektbeteiligte

    bewegen maximieren

  • Projektdaten

    maximieren

    Awards / Auszeichnungen MIPIM Awards 2013 [WINNER BEST INDUSTRIAL & LOGISTICS DEVELOPMENT]
    Baubeginn 2008
    Fertigstellung 2012
    Gebäudetyp Versorgungsanlagen, Kraftwerke (Neubau)
    Projektgröße
    bebaute Fläche 10.960 m2
    Fläche der Freianlagen 26.627 m2
    Projektkosten
    Baukosten (gesamt) 15.206.564 EUR
      zzgl. MwSt.
    Projektadresse ES-08490 - 08397 Tordera / Pineda de Mar
  • Gewährleistung

    competitionline übernimmt keine Verantwortung für Fehler, Auslassungen, Unterbrechungen, Löschungen, Mängel oder Verzögerungen im Betrieb oder bei Übertragung von Inhalten. competitionline übernimmt keine Verantwortung für Einbußen oder Schäden, die aus der Verwendung der Internetseiten, aus der Verwendung von Nutzerinhalten oder von Inhalten Dritter, die aus den Internetseiten oder über den Service gepostet oder an Nutzer übertragen werden, oder aus Interaktionen zwischen Nutzer und Internetseiten (online oder offline) resultieren. Bitte lesen Sie hierzu unsere Nutzungsbedingungen.