• DE-97070 Würzburg
  • 05/2012
  • Result
  • (ID 98407)

Terroir f - Die magischen Orte des fränkischen Weines

Limited competition
Advertisement


  • 1st Prize

    maximize

    • Architect
      Fabian Rügemer

      View entry



  • 2nd Prize

    maximize

    • Architect
      Johannes Flörchinger

      View entry



  • 3rd Prize

    maximize

 
  • Project data

    maximize

    Decision 11.05.2012 Decision
    Procedure Limited competition nach RPW
    Occupational groups Architekten, Civil engineers, Landscape architects, Other specialist planners
    Desired number of participants: 25
    Actual participants: 10
    Type of building Urban planning
    Type of service Objektplanung Freianlagen
    Access area EEA, GPA/ GATT, World Trade Organization WTO
    Language German
    City Am Stein
    DE-97070 Würzburg
    Prize money / Remuneration 5.000 EUR plus VAT (net)
    Awarding authority / Client Stein-Wein-Pfad Würzburg e.V., Würzburg (DE)
    Advisors arc.grün landschaftsarchitekten. stadtplaner GbR, Kitzingen (DE)
    Juror Prof. Christian Baumgart, Prof. Gerhard Hemmerlein [Head juror], Reinhold Jäcklein Personenprofil, Joachim Kaiser, Bernd Starz , Dr. Herrmann Kolesch, Robert Haller, Horst Kolesch
    Chamber Bayerische Architektenkammer
    Assignment
    Der Auslober erwartet sich Vorschläge für die Gestaltung des Informationspunktes im Rahmen des Konzeptes „terroir f“. Gegenstand des Wettbewerbs ist die Freianlagenplanung und die Ausarbeitung einer baulich geeigneten Ausstattungskonzeption an dem angegebenen Standort.
    Downloads 98407_Bekanntmachung WBW Stein.pdf

  • Selection criteria

    maximize

    Proof of financial and economic capacity acc. § 5 (4) VOF Proof is not required
    professional liability insurance for personal injuries No mimimum requirement
    professional liability insurance for material damage and pecuniary loss No mimimum requirement
    Minimum average turnover during the last three years No mimimum requirement
    Information about size of staff No
    Information about working group Working group possible
    Total number references keine Referenzen gefordert
    Time period for references Information is not contained in the tender notice
    Nature of references: Information is not contained in the tender notice
    Service phases in the references: Information is not contained in the tender notice
    Is Information about the office's equipment required? No
    Is information about quality assurance required? No
    Is information about the technical director required? No
    Is subcontracting limited? No
    Are application forms available online? Information is not contained in the tender notice
    Additional category for young (beginners) and/or small offices? only young offices
  • Tender notice

    maximize

    • Not available.
  • Tender result notice

    maximize

    • Not available.
  • Map

    maximize

  • Guarantee

    competitionline is not responsible for mistakes, omissions, interruptions, deletions, defects or delays within a company or in the transmission of disruptions of the communication connection or theft, destruction or changes of the information transmitted by the user or the forbidden access to this information. competitionline is not to be held responsible for technical malfunctions or other problems in computer systems, servers or providers, software, disturbances in emails which result from technical problems or overload of the internet and/or the internet web page of competitionline. Please read our Terms of Use.


Advertisement