loading
  • KH Phnom Penh
  • 08.12.2017
  • Ausschreibung
  • (ID 2-283527)

Cambodia - Sustainable Integrated Urban Public Transport Development For Supporting Sustainable Integrated Urban Public Transport Development


 
  • Projektdaten

    maximieren

    Bewerbungsschluss 08.12.2017 Bewerbungsschluss
    Verfahren Außereuropäische Verfahren
    Gebäudetyp Verkehr
    Art der Leistung Objektplanung Verkehrsanlagen / Studien, Gutachten / Stadt-/ Gebietsplanung
    Aufgabe
    Expressions Of Interest for Sustainable integrated urban public transport development for supporting sustainable integrated urban public transport developmentObjective and Purpose of the Assignment :- The TA will improve Phnom Penh city’s urban public transport system management to achieve a
    sustainable integrated urban public transport system and promote the use of the system through: (i)
    developing policy guides and a planning toolkit for relevant public transport authorities to build
    a sustainable integrated urban public transport system, (ii) formulating candidate integrated urban
    public transport improvement programs to demonstrate a sustainable integrated urban public
    transport system, and (iii) providing capacity development training to the authorities to improve
    authorities’ system management capacity and public awareness raising workshops to promote the use
    of the system.
    The consulting services will assist the Ministry of Public Works and Transport (MPWT) and the PPCC
    in realizing the objective.
    Informationen

    Organisation
    ASIAN DEVELOPMENT BANK (ADB)

    ClientAddress
    No. 29 Suramarit Blvd. (268/19) Sangkat Chaktomuk, Khan Daun Penh, c
    Cambodia
    Tel: +855-59-23 215805, 215806, 216417
    Fax: +855-59-23 215807
    Email_id: MjEzV2BcbWhmVGpUM1RXVSFiZVo=

    Deadline:08-Dec-2017

    Adresse des Bauherren KH-Phnom Penh

  • Anzeigentext Ausschreibung

    maximieren

    • TA 51113-001 CAM: Supporting Sustainable Integrated Urban Public Transport Development - Sustainable Integrated Urban Public Transport Development Date Published: 09-Nov-2017 Deadline of Submitting EOI: 08-Dec-2017 11:59 PM Manila local time Back Express Interest Profile Terms of Reference Cost Estimate Selection Profile Consultant Type Firm Selection Method Quality and Cost-Based Selection (QCBS) Source International Technical Proposal Full Technical Proposal (FTP) Selection Title Supporting Sustainable Integrated Urban Public Transport Development Package Number Package Name Sustainable Integrated Urban Public Transport Development Advance Action Read only Checkbox Checked Yes Read only Checkbox Not Checked No Engagement Period 25 MONTH Consulting Services Budget USD 1,380,000 Budget Type Read only Checkbox Checked Estimated Read only Checkbox Not Checked Maximum Approval Number Approval Date Estimated Short-listing Date 11-Dec-2017 Estimated Commencement Date 15-Mar-2018 Open to non-Member Countries Read only Checkbox Not Checked Yes Read only Checkbox Checked No Additional Information Possibility of contract extension Read only Checkbox Not Checked Yes Read only Checkbox Not Checked No Read only Checkbox Checked Not known Possibility of consideration for downstream assignment Read only Checkbox Not Checked Yes Read only Checkbox Not Checked No Read only Checkbox Checked Not known Indefinite Delivery Contract (IDC) Read only Checkbox Not Checked Yes Read only Checkbox Checked No Country of assignment Cambodia Country of eligibility for national consultants Same as country of assignment Contact Information Project Officer Daisuke Mizusawa Designation Senior Transport Specialist Asian Development Bank Email MTRgaWV2cW9dc108XWBeKmtuYw== Terms of Reference Primary Expertise Urban Transport TOR Keywords urban public transport development Objective and Purpose of the Assignment The TA will improve Phnom Penh city’s urban public transport system management to achieve a sustainable integrated urban public transport system and promote the use of the system through: (i) developing policy guides and a planning toolkit for relevant public transport authorities to build a sustainable integrated urban public transport system, (ii) formulating candidate integrated urban public transport improvement programs to demonstrate a sustainable integrated urban public transport system, and (iii) providing capacity development training to the authorities to improve authorities’ system management capacity and public awareness raising workshops to promote the use of the system. The consulting services will assist the Ministry of Public Works and Transport (MPWT) and the PPCC in realizing the objective. Cost Estimate Competitive Items Amount in USD Remuneration and Other Expenses All activities and inputs in the TOR but not limited to remuneration, per diem, air travel, miscellaneous travel expenses, report preparation, production, and transmission, land transportation, communications, etc. 1,096,300 Sub-total 1,096,300 Non-Competitive Items Amount in USD Provisional Sums 228,800 Contingency 54,900 Sub-total 283,700 TOTAL 1,380,000

  • Protected by Copyscape
  • Gewährleistung

    competitionline übernimmt keine Verantwortung für Fehler, Auslassungen, Unterbrechungen, Löschungen, Mängel oder Verzögerungen im Betrieb oder bei Übertragung von Inhalten. competitionline übernimmt keine Verantwortung für Einbußen oder Schäden, die aus der Verwendung der Internetseiten, aus der Verwendung von Nutzerinhalten oder von Inhalten Dritter, die aus den Internetseiten oder über den Service gepostet oder an Nutzer übertragen werden, oder aus Interaktionen zwischen Nutzer und Internetseiten (online oder offline) resultieren. Bitte lesen Sie hierzu unsere Nutzungsbedingungen.


INFO-BOX

Ausschreibung veröffentlicht 10.11.2017
Zuletzt aktualisiert 10.11.2017
Wettbewerbs-ID 2-283527 Status Kostenpflichtig
Seitenaufrufe 73