1155501 Cost reduction in construction projects, consultancy assignment H001 — Project Manager


 
  • Projektdaten

    maximieren

    Bewerbungsschluss 03.04.2018, 12:00 Bewerbungsschluss
    Verfahren Offenes Verfahren
    Gebäudetyp Städtebauliche Projekte
    Art der Leistung allgemeine Beratungsleistungen / Kostenmanagement
    Sprache Norwegisch
    Aufgabe
    The Directorate of Public Construction and Property [Statsbygg] requests, in connection with project.
    More cost efficient construction projects.
    Tenders for the following consultancy assignment:
    Project Manager.
    The project manager shall manage and implement a development project with the aim of reducing costs in Statsbygg's construction projects. The project will consist of several sub-projects that are connected to a possible cost reduction in construction projects.
    Leistungsumfang
    Statsbygg's builder activity is in a competition situation and must always focus on costs and quality. If the cost level in Statsbygg projects is too high, it can weaken Statsbygg's competitiveness.
    In order to meet this challenge, a decision has been made to establish a development and efficiency project, with the aim of reducing costs. The project's aim is to:
    — Contribute to reducing the total costs in Statsbygg's construction projects on a portfolio level (the estimated reduction target is 20 %). Lifetime costs cannot increase as a result of this, but the lifetime/quality of individual elements in buildings ought to differentiated more,
    — Contribute to the principles of cost efficiency and learning the best practice being part of Statsbygg's company culture. The development project shall be practically organised, with the aim of a quick implementation of improvement measures. The project shall be coordinated with other internal development work in Statsbygg, which is of importance for costs in construction projects. The development project will consist of various sub-projects and pilots, such as (the list is not exhaustive):
    — How to remove/reduce unnecessary cost-driving systems?
    — How to remove systems that do not give any value for the contracting authority?
    — Map decision processes and uncover cost-driving decisions,
    — How to improve cost management in the concept phase, project development and programming?
    — How to reduce engineering design costs?
    — Develop a project culture for learning best practice and cost efficiency,
    — Learning from projects that were successful cost-wise in Statsbygg and from project´s that had cost challenges,
    — Learning from good experiences from other builders who focus on costs,
    — How to make Statsbygg's builder organisation, support functions and support systems more efficient?
    — Develop concrete targets and an incentive culture for cost reduction,
    — Challenge external framework terms and internal requirements that give unnecessarily high costs,
    — Assess new implementation models/procurement forms.
    Adresse des Bauherren NO-0032 Oslo
    TED Dokumenten-Nr. 79739-2018

  • Anzeigentext Ausschreibung

    maximieren

    • Norway-Oslo: Project management consultancy services

      2018/S 036-079739

      Contract notice

      Services

      Directive 2014/24/EU

      Section I: Contracting authority

      I.1)Name and addresses
      Statsbygg
      971278374
      Biskop Gunnerus' gate 6
      Oslo
      0032
      Norway
      Contact person: Frode Aamodt
      Telephone: +47 40557414
      E-mail: MjE4VGBdUlMcT09bXVJiLmFiT2JhUGdVVRxcXQ==
      NUTS code: NO

      Internet address(es):

      Main address: https://permalink.mercell.com/81027687.aspx

      I.2)Joint procurement
      I.3)Communication
      The procurement documents are available for unrestricted and full direct access, free of charge, at: https://permalink.mercell.com/81027687.aspx
      Additional information can be obtained from the abovementioned address
      Tenders or requests to participate must be submitted electronically via: https://permalink.mercell.com/81027687.aspx
      I.4)Type of the contracting authority
      Body governed by public law
      I.5)Main activity
      Other activity: Building and construction work

      Section II: Object

      II.1)Scope of the procurement
      II.1.1)Title:

       

      1155501 Cost reduction in construction projects, consultancy assignment H001 — Project Manager

       

      Reference number: 2018/825
      II.1.2)Main CPV code
      72224000
      II.1.3)Type of contract
      Services
      II.1.4)Short description:

       

      The Directorate of Public Construction and Property [Statsbygg] requests, in connection with project.

      More cost efficient construction projects.

      Tenders for the following consultancy assignment:

      Project Manager.

      The project manager shall manage and implement a development project with the aim of reducing costs in Statsbygg's construction projects. The project will consist of several sub-projects that are connected to a possible cost reduction in construction projects.

       

      II.1.5)Estimated total value
      II.1.6)Information about lots
      This contract is divided into lots: no
      II.2)Description
      II.2.1)Title:
      II.2.2)Additional CPV code(s)
      71315200
      II.2.3)Place of performance
      NUTS code: NO011
      II.2.4)Description of the procurement:

       

      Statsbygg's builder activity is in a competition situation and must always focus on costs and quality. If the cost level in Statsbygg projects is too high, it can weaken Statsbygg's competitiveness.

      In order to meet this challenge, a decision has been made to establish a development and efficiency project, with the aim of reducing costs. The project's aim is to:

      — Contribute to reducing the total costs in Statsbygg's construction projects on a portfolio level (the estimated reduction target is 20 %). Lifetime costs cannot increase as a result of this, but the lifetime/quality of individual elements in buildings ought to differentiated more,

      — Contribute to the principles of cost efficiency and learning the best practice being part of Statsbygg's company culture. The development project shall be practically organised, with the aim of a quick implementation of improvement measures. The project shall be coordinated with other internal development work in Statsbygg, which is of importance for costs in construction projects. The development project will consist of various sub-projects and pilots, such as (the list is not exhaustive):

      — How to remove/reduce unnecessary cost-driving systems?

      — How to remove systems that do not give any value for the contracting authority?

      — Map decision processes and uncover cost-driving decisions,

      — How to improve cost management in the concept phase, project development and programming?

      — How to reduce engineering design costs?

      — Develop a project culture for learning best practice and cost efficiency,

      — Learning from projects that were successful cost-wise in Statsbygg and from project´s that had cost challenges,

      — Learning from good experiences from other builders who focus on costs,

      — How to make Statsbygg's builder organisation, support functions and support systems more efficient?

      — Develop concrete targets and an incentive culture for cost reduction,

      — Challenge external framework terms and internal requirements that give unnecessarily high costs,

      — Assess new implementation models/procurement forms.

       

      II.2.5)Award criteria
      Price is not the only award criterion and all criteria are stated only in the procurement documents
      II.2.6)Estimated value
      II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
      Duration in months: 36
      This contract is subject to renewal: no
      II.2.10)Information about variants
      Variants will be accepted: no
      II.2.11)Information about options
      Options: no
      II.2.12)Information about electronic catalogues
      II.2.13)Information about European Union funds
      The procurement is related to a project and/or programme financed by European Union funds: no
      II.2.14)Additional information

      Section III: Legal, economic, financial and technical information

      III.1)Conditions for participation
      III.1.1)Suitability to pursue the professional activity, including requirements relating to enrolment on professional or trade registers
      List and brief description of conditions:

       

      The tenderer is required to have a legally established company.

      Company registration certificate, foreign companies are required to have an equivalent certificate in the country where the company is registered, alternatively StartBANK ID.

       

      III.1.2)Economic and financial standing
      List and brief description of selection criteria:

       

      Tenderers are required to have satisfactory financial implementation ability.

      The size of the turnover, seen in relation to the contract value, can be emphasised.

      The Norwegian construction and property management department will carry out a credit rating of tenderers.

      Tenderers can, in addition, be asked to submit the auditor confirmed annual accounts, alternatively, state StartBANK ID.

       

      III.1.3)Technical and professional ability
      III.1.5)Information about reserved contracts
      III.2)Conditions related to the contract
      III.2.1)Information about a particular profession
      III.2.2)Contract performance conditions:
      III.2.3)Information about staff responsible for the performance of the contract

      Section IV: Procedure

      IV.1)Description
      IV.1.1)Type of procedure
      Open procedure
      IV.1.3)Information about a framework agreement or a dynamic purchasing system
      IV.1.4)Information about reduction of the number of solutions or tenders during negotiation or dialogue
      IV.1.6)Information about electronic auction
      IV.1.8)Information about the Government Procurement Agreement (GPA)
      The procurement is covered by the Government Procurement Agreement: yes
      IV.2)Administrative information
      IV.2.1)Previous publication concerning this procedure
      IV.2.2)Time limit for receipt of tenders or requests to participate
      Date: 03/04/2018
      Local time: 12:00
      IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
      IV.2.4)Languages in which tenders or requests to participate may be submitted:
      Norwegian
      IV.2.6)Minimum time frame during which the tenderer must maintain the tender
      Duration in months: 3 (from the date stated for receipt of tender)
      IV.2.7)Conditions for opening of tenders
      Date: 03/04/2018
      Local time: 12:00

      Section VI: Complementary information

      VI.1)Information about recurrence
      This is a recurrent procurement: no
      VI.2)Information about electronic workflows
      VI.3)Additional information:
      VI.4)Procedures for review
      VI.4.1)Review body
      Oslo Tingrett
      Oslo
      Norway
      VI.4.2)Body responsible for mediation procedures
      VI.4.3)Review procedure
      VI.4.4)Service from which information about the review procedure may be obtained
      VI.5)Date of dispatch of this notice:
      20/02/2018
    © European Union, http://ted.europa.eu
  • Protected by Copyscape
  • Gewährleistung

    competitionline übernimmt keine Verantwortung für Fehler, Auslassungen, Unterbrechungen, Löschungen, Mängel oder Verzögerungen im Betrieb oder bei Übertragung von Inhalten. competitionline übernimmt keine Verantwortung für Einbußen oder Schäden, die aus der Verwendung der Internetseiten, aus der Verwendung von Nutzerinhalten oder von Inhalten Dritter, die aus den Internetseiten oder über den Service gepostet oder an Nutzer übertragen werden, oder aus Interaktionen zwischen Nutzer und Internetseiten (online oder offline) resultieren. Bitte lesen Sie hierzu unsere Nutzungsbedingungen.


INFO-BOX

Ausschreibung veröffentlicht 21.02.2018
Zuletzt aktualisiert 21.02.2018
Wettbewerbs-ID 2-293202 Status Kostenpflichtig
Seitenaufrufe 41