loading
  • ZW Harare
  • 05.06.2018
  • Ausschreibung
  • (ID 2-302977)

Transport Sector Investment Study for Zimbabwe


 
  • Projektdaten

    maximieren

    Bewerbungsschluss 05.06.2018 Bewerbungsschluss
    Verfahren Außereuropäische Verfahren
    Gebäudetyp Verkehr
    Art der Leistung Studien, Gutachten
    Sprache Englisch
    Aufgabe
    Expressions of interest for Transport Sector Investment Study for Zimbabwe.
    Scope of Work
    Task 1: Review Zimbabwes Portfolio of Transport Projects for Roads, Rail and Aviation Within the Past 2 Decades and Generate a General
    Performance Assessment of Projects for Each Mode Based on the Following Indicators:
    Strategic Selection Process
    Well-defined Project Objectives and Plan of Execution
    Successful Project Implementation I.e. Actualizing Concept Design
    Achievement of Expected Outcomes and Anticipated Project Impacts
    Project Sustainability
    Task 2: Conduct a Needs Assessment of the 3 Modes to Identify Gaps Related to Institutional Management, Operations and Inventory of
    Assets. Needs Assessment Must Include Consultations With Relevant Stakeholders Such as Agency Staff, Operators, Users and Ngos
    Associated With the 3 Modes. Assessment Must Include but Not Be Limited to:
    The Ability of the Three Modes to Meet Present and Projected User Demand Both Within Zimbabwe and to a Broader Extent, Sadc
    The Capacity of the Modes to Adequately Support the Socio-economic Welfare of Zimbabweans and to Provide a Given Level of
    Satisfaction in Day to Day Activities.
    The Contribution of These Modes to Zimbabwes Competitive Advantage (or Lack Thereof) as a Transport Hub in Southern Africa
    Task 3: Using Inputs From Tasks 1 and 2 as Well as the Transport Master Plan for Zimbabwe , Identify a List of Feasible Short to Medium
    Pipeline Projects Targeted at Both Urban and Rural Settings. Projects Should Be Based on Achieving the Following Core Development
    Principles:
    Value for Money for Relevant Stakeholders
    Ability to Enhance Productivity and Generate Resilient Economic Growth
    Good Governance
    Equity and Accessibility
    Environmental and Social Sustainability
    Standalone, Finite Projects Could Be Identified in Terms of Priority Ranking, Connectivity Type (International, National, Urban, Rural), Size or a
    Combination of All.
    Task 4: Based on the List of Identified Pipeline Projects in Task 3, Consultants Are Requested to Develop the Following:
    Possible Action Strategies and Plans to Conceptualize and Implement Each Project. This Should Include Estimated Timelines, Stakeholder
    Responsibilities and Engagement; Etc. Projects Can Be Listed on a Prioritization Scale Based on Significance, Readiness; Constraints Etc.
    Potential Benefit-cost Analyses of Each Project.
    Lessons Learned From Task 1 That Can Safeguard Investments in Future Projects
    Internal or External Risk Profiles for Each Pipeline Project. Examples of Such Risks Could Be Political, Social and Environmental (Climate
    Change); Fiduciary; or Could Be Related to Sector or Corporate Governance, Etc.
    Task 5: Identify Ways by Which Sustainability of Pipeline Projects Can Be Guaranteed as Relates to Areas Including but Not Limited to
    Country Ownership of Projects;
    Capacity Building Opportunities for Stakeholders to Manage and Operate Projects
    Continuous Stakeholder Input and Involvement Du
    Informationen

    Organisation
    WORLD BANK (WB)

    ClientAddress
    Block 3, Arundel Business Park
    107 Norfolk Road, Mount Pleasant
    Harare
    Zimbabwe
    Tel: +263-4 369-130/1
    Email_id: MTZdZWJvamJfOnFpbGZeXFtoZShpbGE=

    Tender Notice No:1257646
    Deadline:05-Jun-2018

    Downloads Bekanntmachung.pdf
    Adresse des Bauherren ZW-Harare

  • Anzeigentext Ausschreibung

    maximieren

    • Liegt nicht vor.
  • Protected by Copyscape
  • Gewährleistung

    competitionline übernimmt keine Verantwortung für Fehler, Auslassungen, Unterbrechungen, Löschungen, Mängel oder Verzögerungen im Betrieb oder bei Übertragung von Inhalten. competitionline übernimmt keine Verantwortung für Einbußen oder Schäden, die aus der Verwendung der Internetseiten, aus der Verwendung von Nutzerinhalten oder von Inhalten Dritter, die aus den Internetseiten oder über den Service gepostet oder an Nutzer übertragen werden, oder aus Interaktionen zwischen Nutzer und Internetseiten (online oder offline) resultieren. Bitte lesen Sie hierzu unsere Nutzungsbedingungen.


INFO-BOX

Ausschreibung veröffentlicht 24.05.2018
Zuletzt aktualisiert 24.05.2018
Wettbewerbs-ID 2-302977 Status Kostenpflichtig
Seitenaufrufe 32