Network Rail Footbridge Design Ideas Competition


 
  • Projektdaten

    maximieren

    Entscheidung 08.10.2018 Entscheidung
    Verfahren Offener Wettbewerb
    Gebäudetyp Verkehr
    Art der Leistung Objektplanung Verkehrsanlagen / Design
    Auslober/Bauherr Network Rail, London (GB)
    Betreuer RIBA Royal Institute of British Architects, Leeds (GB), London (GB)
    Preisrichter Paul Finch, Rowan Conway, Anthony Dewar, Margaret Hickish, Kay Hughes, Jonathan McDowell, Chris Wise
    Aufgabe
    The competition is open internationally to practising architects, structural engineers, civil engineers or teams thereof, together with students of these design disciplines. In doing so, the selection process is seeking ideas to contribute towards and influence new standard designs rather than a solution that will necessarily be implemented. The design ideas competition will be held over a single stage, with a design fund of £20,000 to be awarded to the submission judged to be the best response to the design challenge.
    Leistungsumfang
    In launching the competition Network Rail is seeking to re-affirm its commitment to good design across the nation, and the delivery of excellent ordinary. Given that it is unrealistic to think that a one-size-fits-all approach is appropriate given the context of Network Rail's national footbridge portfolio, the aspiration is to generate a catalogue of appropriate footbridge designs affording greater flexibility in addressing sites across the country. The intention of this Open Ideas competition is to progress the winning entry through detailed design development post Network Rail's funding settlement for the operating period 2019-2024 resulting in a new addition to the catalogue – it is expected that this will be undertaken via Network Rail's new Architectural framework and the competition winners details will be included in the remit for this detailed design work. In addition to this competition, under a separate work stream, Network Rail will also refresh its current standard design (adopted following a competitive tender process in 2007) via a more traditional procurement approach. Further options to develop additional appropriate footbridge designs in the catalogue will be explored in due course to ensure excellent design is at the heart of everything Network Rail undertakes.

    Network Rail owns about 2,400 footbridges providing access across the railway for both passengers at stations and people using rights of way. Most of these footbridges are single-span structures, with the majority having a main span of 16m or less. Over a third of Britain's railway infrastructure is now electrified and the structures required to span the railway often represent the most significant change in the local landscape since the introduction of the railway itself. Electrification of the network has enabled faster trains with reduced carbon emissions, but has also resulted in perceptibly taller footbridge structures which take longer to cross and have a greater visual impact.

    As part of the Department for Transport's Access for All (AfA) programme, Network Rail has installed 200 footbridges since 2006. The AfA funding initiative was established to improve accessibility at railway stations through the creation of obstacle free routes from station entrance to the platform. Alongside this programme, further, accessible, bridges have been installed as part of Network Rail's high risk level crossing closure programme and its cyclical Renewals workbank. Each of these three key programmes of work will be continued post Network Rail's funding settlement for the operating period 2019–2024.

    Despite the processes and deliverables of each of the above programmes being the same — a new footbridge, there is, currently, some disparity from a design perspective in how the programmes are approached. Having a catalogue of appropriate designs should result in greater alignment with a more recognisable design identity

    Ideas developed for this competition should be innovative, challenge presumptions and significantly raise expectations for the quality of future designs while also giving due consideration to practicality, construction and maintenance. In developing their proposals, Competitors are encouraged to consider how their fully accessible footbridge designs may be adapted for use in other settings such as replacements for level crossings.
    Informationen

    Timeline

    Competition Launch & Registration Opens    Fri. 22 June 2018
    Deadline to raise Questions on the Brief    Tues. 10 July 2018, 17.00 (BST)
    Memo issued in response to Questions    Tues. 24 July 2018
    Deadline to apply for Unique Registration Number    Thurs. 13 Sept. 2018, 17.00 (BST)
    Deadline for receipt of design submissions    Tues. 18 Sept. 2018, 14.00 (BST)
    Evaluation of design submissions commences    Wed. 19 Sept. 2018
    Judging Panel meeting W/c   Mon. 08 Oct. 2018
    Public announcement of result Tbc

    Bekanntmachung

    Adresse des Bauherren UK-N1 9AG London
      Entscheidung anzeigen

  • Anzeigentext Ausschreibung

    maximieren

    • Liegt nicht vor.
  • Protected by Copyscape
  • Gewährleistung

    competitionline übernimmt keine Verantwortung für Fehler, Auslassungen, Unterbrechungen, Löschungen, Mängel oder Verzögerungen im Betrieb oder bei Übertragung von Inhalten. competitionline übernimmt keine Verantwortung für Einbußen oder Schäden, die aus der Verwendung der Internetseiten, aus der Verwendung von Nutzerinhalten oder von Inhalten Dritter, die aus den Internetseiten oder über den Service gepostet oder an Nutzer übertragen werden, oder aus Interaktionen zwischen Nutzer und Internetseiten (online oder offline) resultieren. Bitte lesen Sie hierzu unsere Nutzungsbedingungen.


INFO-BOX

Ausschreibung veröffentlicht 28.06.2018
Zuletzt aktualisiert 31.03.2021
Wettbewerbs-ID 2-306693 Status
Seitenaufrufe 214