loading
  • CA Winnipeg
  • 10/2018
  • Ergebnis
  • (ID 2-309174)

Warming Huts: An Art + Architecture Competition On Ice


 
  • Projektdaten

    maximieren

    Entscheidung 05.10.2018 Entscheidung
    Preisverleihung : 11/2018
    Verfahren Offener Wettbewerb (auch für Studenten)
    Berufsgruppen Architektur, Innenarchitektur, Kunst, Landschaftsarchitektur
    Gebäudetyp Kunst / Landschaft und Freiraum
    Art der Leistung Objektplanung Gebäude / Kunst
    Auslober/Bauherr The Forks General Inquiries, Winnipeg (CA)
    Preisrichter Kevin Loewen, Graham Hogan, Richard Kroeker, Clare MacKay, Sasa Radulovic, Bob Somers, Johanna Hurme, Michael Scatliff, Jim August
    Aufgabe
    Three teams will be selected as winners of the WARMING HUTS: And Arts + Architecture Competiton on Ice from submissions of designs for a warming hut or art installation. Winning entries will be placed along the Red River Mutual Trail located on the Assiniboine and Red rivers in Winnipeg, Manitoba. A jury will select the winning designs based on their creativity in use of materials, providing shelter, poetics of assembly and form, integration with the landscape, and ease of construction.
    Leistungsumfang
    The huts or installations are placed along the Red River Mutual Trail at The Forks in Winnipeg, Manitoba (www.theforks.com). The Forks is located in downtown Winnipeg, at the junction of the Red River and the Assiniboine River. The intersection of the two rivers historically has made the area a popular meeting place for over 6,000 years. In recent times, the site has developed into a popular destination for tourists and locals alike, with over four million visitors annually.

    In winter, the rivers are also used as an alternate route to access downtown by foot, bike, skates and skis. There are opportunities for curling, hockey and much more. With many access points, the Red River Mutual Trail, is a link between communities in Winnipeg. The Red River Mutual Trail is regularly groomed and monitored for any safety concerns. There will also be extra security at night in an attempt to prevent people from loitering or damaging the huts.

    Weather in Winnipeg during the months of January and February can be extremely cold with temperatures reaching below -300C. Teams are encouraged to engage the effects of solar radiation, wind chill, and the constantly shifting landscape of the snow covered river. The depth of the ice on the Assiniboine and Red River at the end of January can be as deep as 1 meter thick.
    Informationen

    Winning entrants will be notified and requested to develop construction drawings for submission to a technical committee. Design development will involve input from the technical committee to ensure that construction is feasible and within budget.

    Honoraria and Budget:

    The budget for the creation and construction of each project is $16, 500 (CAN). This budget is divided in the following fashion:

    up to $3,500.00 for the designers’ honorarium
    up to $7,500.00 (including taxes) for the purchase of materials and/or the employment of consultants necessary for the realization of the project. This budget is managed jointly by The Forks and the designer
    up to $4,000.00 for labour costs for the construction of the project
    up to $1,500.00 for Construction Management conducted by The Forks

    Up to $1,000.00 is available for accommodation expenses and up to $2,500.00 is available for airfare. All travel expenses are only applicable to foreign teams.

    Schedule

    October 2, 2018 2:00pm CST - Deadline for submissions
    October 5, 2018 - Jury of Competition
    October 8-26, 2018 - Technical Review
    Early November, 2018 - Winner Announcement
    November 14, 2018 - Construction Documents Due
    November 2018 - January 23, 2019 - Construction Period
    January 23-27, 2019 - Building Blitz (Teams travel to Winnipeg)

    Bekanntmachung

    Adresse des Bauherren CA-Winnipeg
      Entscheidung anzeigen

  • Anzeigentext Ausschreibung

    maximieren

    • Liegt nicht vor.
  • Protected by Copyscape
  • Gewährleistung

    competitionline übernimmt keine Verantwortung für Fehler, Auslassungen, Unterbrechungen, Löschungen, Mängel oder Verzögerungen im Betrieb oder bei Übertragung von Inhalten. competitionline übernimmt keine Verantwortung für Einbußen oder Schäden, die aus der Verwendung der Internetseiten, aus der Verwendung von Nutzerinhalten oder von Inhalten Dritter, die aus den Internetseiten oder über den Service gepostet oder an Nutzer übertragen werden, oder aus Interaktionen zwischen Nutzer und Internetseiten (online oder offline) resultieren. Bitte lesen Sie hierzu unsere Nutzungsbedingungen.


INFO-BOX

Ausschreibung veröffentlicht 18.07.2018
Zuletzt aktualisiert 18.07.2018
Wettbewerbs-ID 2-309174 Status
Seitenaufrufe 282