loading
Diashow »
  • ES-28005 Madrid
  • Realisiertes Projekt

Acondicionamiento de Edificios para Almacen Industrial, Oficinas y Garaje


Projektbeschreibung:
EDIFICIO MAKRO
First urban store and new offices
Paseo Imperial, 40-42 Madrid – Spain


A new model always requires the development of a new architectural concept.

The company has developed a new Makro store model wholesale located in central areas of cities and service professionals catering and hospitality of their immediate environment.

The building, rehabilitation of a warehouse sale of timber and building materials preexisting, also houses the headquarters of the company in Spain.

In... +
EDIFICIO MAKRO
First urban store and new offices
Paseo Imperial, 40-42 Madrid – Spain


A new model always requires the development of a new architectural concept.

The company has developed a new Makro store model wholesale located in central areas of cities and service professionals catering and hospitality of their immediate environment.

The building, rehabilitation of a warehouse sale of timber and building materials preexisting, also houses the headquarters of the company in Spain.

In the process of renovating the 17,751 m² building, constructed in reinforced concrete, work has been done on an area of 10,642 m², which has allowed:

- The creation of a double-height ground floor
- The reorganization of the vertical spaces, placing them at the perimeter and releasing the central zone
- The opening up of two courtyards, one interior and one exterior, making it possible to bring light to the heart of the building, improving the lighting conditions of the space intended for the company’s offices.

The concrete structure has been reinforced with steel, which has made it possible to develop the construction process of the building very quickly.

The existing GRC envelope has been removed and replaced with a glass skin and zinc elements with different configurations, strengthening the austere, industrial image the company asked for.

Up to four different configurations of the material have been arranged on the façades. In the opaque areas, smooth and perforated fretwork panels are alternated with glass zones. In the middle, the zinc trays produce a rhythm that makes the material less flat. The upper strips that diffuse the light in the working areas have been achieved with folded zinc, forming coverings for pillars or framework.

The metal coverings are associated with the image of the company’s superstores. As well as being used throughout the centuries on roofs in European cities, zinc is both an industrial and a historic material, which means it easily fits in with its nearby surroundings.

Zinc is a material present in the historic city. Its use makes it possible to adapt a clearly industrial building to the built-up environment.

It means tradition and innovation go hand in hand to resolve an envelope with elegance and austerity while maintaining the recurring image of the company that leads the wholesale food market.

Its choice is based on the conviction that the material makes it possible to provide the project with the following aspects:

o Adaptation and integration into the historic city, understood as a surface of linear strata in time.
o Versatility and flexibility offered by the material itself and the industry that accompanies it.
o Desire to anchor the building in a company image taking the form of the markedly industrial vision of the envelope of its buildings.

The restrained, elegant building vibrates under the changing light like a huge mermaid stranded on Paseo Imperial – Madrid.


JOB First urban store and new offices

SITE Paseo Imperial, 40-42

LOCATION Madrid, España

CLIENT MAKRO Autoservicio Mayorista
Architect Project Manager José Luis Olalla Merlo

ARCHITECTS
Design Enrique Bardají Álvarez
Carlos Santi Merayo
Construction Management Enrique Bardají & Asociados, S.L.

CONSTRUCTION FIRM ANKARSA, Doval Building

BUILDING YRVHNIVISN
Woks Manager
Ealth and Safety Coordinator José Luis Mateo García

ENGINEERS structures VALLADARES Ingeniería

ENGINEERS installations VALLADARES Ingeniería

PROJECT & CONSTRUCT MANAGER EXACUO Alberto Meneu, Lola Rodríguez

AREA OF ACTION: 17.751,52 m2

Nº OF FLOORS: 7 above ground and 3 underground

BUDGET: 7.246.843,21 € (Fase I)
2.947.966,00 € (Fase II)

EXECUTION TIME: 06/08/2012 a 28/12/2012
21/05/2013 a 12/09/2013


PROGRAM USES Commercial space for wholesalers
Company Headquarters
Show-room wine and industrial kitchens
Classrooms and space Gourmet

MAIN PARTNER COMPANIES

FACADE AND COVERING ZINC WMZINC Doval Building
STONY COATINGS Extremarmol
FRIO INDUSTRIAL INSTALLATION Carrier-Linde
HEATING/AI CONDITTIONING INSTALLATION Area 2
FIRE PROTECTION INSTALLATION Madrinelco
ELECTRICAL INSTALLATION Secoelectric
TELECOMMUNICATIONS INSTALLATION Confaire
PLUMBING AND SANITATION Area 2
SOLAR INSTALLATION AND GAS Area 2
LOCKSMITH AND METALWORKS Mafesa
INFOGRAFIA AND VIDEO Luis Cabrejas
PHOTOS Jesús Granada (outside)
Miguel Angel García (inside) -


Anzeige


  • Projektbeteiligte

    bewegen maximieren

  • Projektdaten

    maximieren

    Awards / Auszeichnungen Archizinc Trophy 2014 [Gewinner "Commercial Building"]
    Fertigstellung 2012
    Gebäudetyp Büro-, Verwaltungsbauten
    Projektadresse Paseo Imperial, 40-42
    ES-28005 Madrid
  • Gewährleistung

    competitionline übernimmt keine Verantwortung für Fehler, Auslassungen, Unterbrechungen, Löschungen, Mängel oder Verzögerungen im Betrieb oder bei Übertragung von Inhalten. competitionline übernimmt keine Verantwortung für Einbußen oder Schäden, die aus der Verwendung der Internetseiten, aus der Verwendung von Nutzerinhalten oder von Inhalten Dritter, die aus den Internetseiten oder über den Service gepostet oder an Nutzer übertragen werden, oder aus Interaktionen zwischen Nutzer und Internetseiten (online oder offline) resultieren. Bitte lesen Sie hierzu unsere Nutzungsbedingungen.


INFO-BOX

veröffentlicht am 09.07.2014
Zuletzt aktualisiert 17.07.2014
Projekt-ID 5-55109
Seitenaufrufe 325



Anzeige





Anzeige