66905 Oslo police station H001 Condition analysis


 
  • Projektdaten

    maximieren

    Bewerbungsschluss 09.01.2015, 11:00 Bewerbungsschluss
    Verfahren Offenes Verfahren
    Gebäudetyp Feuerwehr, Polizei, Vollzug
    Art der Leistung Studien, Gutachten
    Sprache Norwegisch
    Aufgabe
    Oslo police station is in such bad condition that the plan is to renovate the building. The aim of the condition analysis is to map what measures must be implemented and their resulting costs. As the building is listed, it is necessary that the consultant group that shall carry out the assignment has experience from work on this type of building. A cultural monument consultant employed in Statsbygg's architecture department will otherwise contribute to the group with cultural monument expertise throughout the process and will handle communication with the cultural heritage authorities if needed.
    The offered consultant group shall:
    Main points:
    1. Carry out a condition analysis on level 2 and possibly level 3 on selected objects, in accordance with NS EN 16096 and NS 3424 and as agreed.
    2. Propose a cost limit.
    3. Prioritise the measures in a separate list.
    4. Carry out a technical fire condition analysis. (Separate report).
    5. Carry out an environment mapping. (Separate report).
    6. Scanning the building and subsequent modelling
    7. Present reports to the builder/user.
    Leistungsumfang
    66905 Oslo police station
    for tenders for the following consultancy assignments:
    H001 Condition analysis
    Tenders are wanted for the implementation of a condition analysis, level 2 and level 3 (selected objects) in accordance with NS-EN 16096 and NS 3424, cost estimate and environment mapping at Oslo police station. The building is listed. One environment report, one fire report and one condition analysis report are to be submitted as well as a BIM model based on a full scanning of the building. Executive workers are to be offered for the following disciplines:
    Consultant engineer construction RIB
    Consultant engineer fire RIBr
    Consultant engineer electro RIE
    Consultant engineer HVAC (RIV)
    Consultant engineer environment (RIM)
    Assignment manager scanning
    Assignment manager modelling
    Otherwise the following applies:
    — RIB shall be responsible for the consultant group and shall handle all contact with Statsbygg.
    — Names of executive officers, hourly rates and CVs shall be submitted for RIB, RIBr, RIV and RIE.
    — Only hourly rates shall be submitted in the competition for RIM. The CV shall be sent and approved for this person when the contract is signed.
    — Only hour rates shall be provided for the assignment manager for scanning and modelling. The CVs for these persons shall be sent before and possibly approved when the contract is signed.
    Adresse des Bauherren NO-0032 Oslo
    TED Dokumenten-Nr. 384619-2014

  • Anzeigentext Ausschreibung

    maximieren


    • Auftragsbekanntmachung

      Dienstleistungen
      Richtlinie 2004/18/EG

      Abschnitt I: Öffentlicher Auftraggeber

      I.1) Name, Adressen und Kontaktstelle(n)
      Statsbygg Hovedkontor
      971278374
      Postbok 8106 Dep. (Biskop Gunnerusgt. 6)
      Zu Händen von: Thore Haugen
      0032
      Oslo
      NORWEGEN
      +47 81555045
      MjIwYFRbVCxfYE1gX05lU1MaWls=
      +47 22954001

      Internet-Adresse(n):


      Hauptadresse des öffentlichen Auftraggebers: http://www.statsbygg.no/
      Adresse des Beschafferprofils: https://kgv.doffin.no/ctm/Supplier/CompanyInformation/Index/2672
      Elektronischer Zugang zu Informationen: https://kgv.doffin.no/ctm/Supplier/Documents/Folder/123839
      Weitere Auskünfte erteilen:
      die oben genannten Kontaktstellen

      Ausschreibungs- und ergänzende Unterlagen (einschließlich Unterlagen für den wettbewerblichen Dialog und ein dynamisches Beschaffungssystem) verschicken:
      die oben genannten Kontaktstellen

      Angebote oder Teilnahmeanträge sind zu richten an:
      die oben genannten Kontaktstellen

      Abschnitt II: Auftragsgegenstand

      II.1) Beschreibung

      II.1.6) Gemeinsames Vokabular für öffentliche Aufträge (CPV)
      71315200

      Beschreibung
      Bautechnische Beratung.

      Abschnitt IV: Verfahren

      IV.3) Verwaltungsangaben

      IV.3.3) Bedingungen für den Erhalt von Ausschreibungs- und ergänzenden Unterlagen bzw. der Beschreibung

      IV.3.4) Schlusstermin für den Eingang der Angebote oder Teilnahmeanträge
      9.1.2015 - 11:00

      IV.3.6) Sprache(n), in der (denen) Angebote oder Teilnahmeanträge verfasst werden können
      Sonstige: Norwegian.

       

       


       


      Contract notice

      Services
      Directive 2004/18/EC

      Section I: Contracting authority

      I.1) Name, addresses and contact point(s)
      For the attention of: Telephone: E-mail: Fax: Statsbygg Hovedkontor 971278374 Postbok 8106 Dep. (Biskop Gunnerusgt. 6) Thore Haugen 0032Oslo NORWAY +47 81555045 MjE3Y1deVy9iY1BjYlFoVlYdXV4= +47 22954001

      Internet address(es):
      General address of the contracting authority: http://www.statsbygg.no/
      Address of the buyer profile: https://kgv.doffin.no/ctm/Supplier/CompanyInformation/Index/2672
      Electronic access to information: https://kgv.doffin.no/ctm/Supplier/Documents/Folder/123839
      Further information can be obtained from: The above mentioned contact point(s)
      Specifications and additional documents (including documents for competitive dialogue and a dynamic purchasing system) can be obtained from: The above mentioned contact point(s)
      Tenders or requests to participate must be sent to: The above mentioned contact point(s)
      I.2) Type of the contracting authority
      Body governed by public law

      I.3) Main activity
      Other: Building and construction work

      I.4) Contract award on behalf of other contracting authorities
      The contracting authority is purchasing on behalf of other contracting authorities: no

      Section II: Object of the contract

      II.1) Description

      II.1.1) Title attributed to the contract by the contracting authority:
      66905 Oslo police station H001 Condition analysis.

      II.1.2) Type of contract and location of works, place of delivery or of performance
      Services
      Service category No 12: Architectural services; engineering services and integrated engineering services; urban planning and landscape engineering services; related scientific and technical consulting services; technical testing and analysis services
      Main site or location of works, place of delivery or of performance: Oslo, Norway.
      NUTS code NO

      II.1.3) Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
      The notice involves a public contract

      II.1.4) Information on framework agreement

      II.1.5) Short description of the contract or purchase(s)
      Oslo police station is in such bad condition that the plan is to renovate the building. The aim of the condition analysis is to map what measures must be implemented and their resulting costs. As the building is listed, it is necessary that the consultant group that shall carry out the assignment has experience from work on this type of building. A cultural monument consultant employed in Statsbygg's architecture department will otherwise contribute to the group with cultural monument expertise throughout the process and will handle communication with the cultural heritage authorities if needed.
      The offered consultant group shall:
      Main points:
      1. Carry out a condition analysis on level 2 and possibly level 3 on selected objects, in accordance with NS EN 16096 and NS 3424 and as agreed.
      2. Propose a cost limit.
      3. Prioritise the measures in a separate list.
      4. Carry out a technical fire condition analysis. (Separate report).
      5. Carry out an environment mapping. (Separate report).
      6. Scanning the building and subsequent modelling
      7. Present reports to the builder/user.

      II.1.6) Common procurement vocabulary (CPV)
      71315200

      II.1.7) Information about Government Procurement Agreement (GPA)
      The contract is covered by the Government Procurement Agreement (GPA): yes

      II.1.8) Lots
      This contract is divided into lots: no

      II.1.9) Information about variants
      Variants will be accepted: no

      II.2) Quantity or scope of the contract

      II.2.1) Total quantity or scope:
      66905 Oslo police station
      for tenders for the following consultancy assignments:
      H001 Condition analysis
      Tenders are wanted for the implementation of a condition analysis, level 2 and level 3 (selected objects) in accordance with NS-EN 16096 and NS 3424, cost estimate and environment mapping at Oslo police station. The building is listed. One environment report, one fire report and one condition analysis report are to be submitted as well as a BIM model based on a full scanning of the building. Executive workers are to be offered for the following disciplines:
      Consultant engineer construction RIB
      Consultant engineer fire RIBr
      Consultant engineer electro RIE
      Consultant engineer HVAC (RIV)
      Consultant engineer environment (RIM)
      Assignment manager scanning
      Assignment manager modelling
      Otherwise the following applies:
      — RIB shall be responsible for the consultant group and shall handle all contact with Statsbygg.
      — Names of executive officers, hourly rates and CVs shall be submitted for RIB, RIBr, RIV and RIE.
      — Only hourly rates shall be submitted in the competition for RIM. The CV shall be sent and approved for this person when the contract is signed.
      — Only hour rates shall be provided for the assignment manager for scanning and modelling. The CVs for these persons shall be sent before and possibly approved when the contract is signed.

      II.2.2) Information about options
      Options: no

      II.2.3) Information about renewals
      This contract is subject to renewal: no

      II.3) Duration of the contract or time limit for completion
      Section III: Legal, economic, financial and technical information

      III.1) Conditions relating to the contract

      III.1.1) Deposits and guarantees required:

      III.1.2) Main financing conditions and payment arrangements and/or reference to the relevant provisions governing them:

      III.1.3) Legal form to be taken by the group of economic operators to whom the contract is to be awarded:

      III.1.4) Other particular conditions
      The performance of the contract is subject to particular conditions: no

      III.2) Conditions for participation

      III.2.1) Personal situation of economic operators, including requirements relating to enrolment on professional or trade registers
      Information and formalities necessary for evaluating if the requirements are met: The tenderer/company(companies) is required to have a legally established company.
      Company Registration Certificate, foreign companies are required to have a corresponding certificate as prescribed by the laws of the country where the business is registered.

      III.2.2) Economic and financial ability
      Information and formalities necessary for evaluating if the requirements are met: The tenderer/company(companies) is required to have good solidity and the financial ability to fulfil the contract.
      Complete annual accounts for the last three years and the auditor's report. Statsbygg reserves the right to carry out a credit check.
      2 tax certificates and fee certificates shall be submitted:
      — Tax certificate (tax, advanced payment, attachment of earnings, employer contributions).
      — VAT certificate.

      III.2.3) Technical capacity
      Information and formalities necessary for evaluating if the requirements are met:
      The tenderer/company(companies) is required to have experience from assignments of a relevant size, complexity and function (all disciplines).
      — List of relevant reference projects from the last 3 years.
      The company shall select 2-3 completed relevant condition analyses per discipline.
      These shall contain:
      — Extent,
      — Date of execution,
      — Size of area,
      — Age of the building,
      — Type of building,
      — Contracting authority.
      The level of the analyses must be described.

      III.2.4) Information about reserved contracts

      III.3) Conditions specific to services contracts

      III.3.1) Information about a particular profession
      Execution of the service is reserved to a particular profession: no

      III.3.2) Staff responsible for the execution of the service
      Legal persons should indicate the names and professional qualifications of the staff responsible for the execution of the service: no

      Section IV: Procedure

      IV.1) Type of procedure

      IV.1.1) Type of procedure
      Open

      IV.1.2) Limitations on the number of operators who will be invited to tender or to participate

      IV.1.3) Reduction of the number of operators during the negotiation or dialogue

      IV.2) Award criteria

      IV.2.1) Award criteria
      The most economically advantageous tender in terms of the criteria stated in the specifications, in the invitation to tender or to negotiate or in the descriptive document

      IV.2.2) Information about electronic auction
      An electronic auction will be used: no

      IV.3) Administrative information

      IV.3.1) File reference number attributed by the contracting authority:
      201402809

      IV.3.2) Previous publication(s) concerning the same contract
      no

      IV.3.3) Conditions for obtaining specifications and additional documents or descriptive document
      Payable documents: no

      IV.3.4) Time limit for receipt of tenders or requests to participate
      9.1.2015 - 11:00

      IV.3.5) Date of dispatch of invitations to tender or to participate to selected candidates

      IV.3.6) Language(s) in which tenders or requests to participate may be drawn up
      Other: Norwegian.

      IV.3.7) Minimum time frame during which the tenderer must maintain the tender

      IV.3.8) Conditions for opening of tenders
      Place: For the attention of: Statsbygg HovedkontorBiskop Gunnerusgt. 6Thore Haugen0155OsloNORWAYPersons authorised to be present at the opening of tenders: yes
      Additional information about authorised persons and opening procedure: Tenderers.

      Section VI: Complementary information

      VI.1) Information about recurrence
      This is a recurrent procurement: no

      VI.2) Information about European Union funds
      The contract is related to a project and/or programme financed by European Union funds: no

      VI.3) Additional information

      VI.4) Procedures for appeal

      VI.4.1) Body responsible for appeal procedures

      VI.4.2) Lodging of appeals

      VI.4.3) Service from which information about the lodging of appeals may be obtained

      VI.5) Date of dispatch of this notice:
      7.11.2014

       

       

       

       

    © European Union, http://ted.europa.eu
  • Protected by Copyscape
  • Gewährleistung

    competitionline übernimmt keine Verantwortung für Fehler, Auslassungen, Unterbrechungen, Löschungen, Mängel oder Verzögerungen im Betrieb oder bei Übertragung von Inhalten. competitionline übernimmt keine Verantwortung für Einbußen oder Schäden, die aus der Verwendung der Internetseiten, aus der Verwendung von Nutzerinhalten oder von Inhalten Dritter, die aus den Internetseiten oder über den Service gepostet oder an Nutzer übertragen werden, oder aus Interaktionen zwischen Nutzer und Internetseiten (online oder offline) resultieren. Bitte lesen Sie hierzu unsere Nutzungsbedingungen.


INFO-BOX

Ausschreibung veröffentlicht 11.11.2014
Zuletzt aktualisiert 11.11.2014
Wettbewerbs-ID 2-184001 Status Frei
Seitenaufrufe 125