Execution of Front End Engineering Design Study (FEED Study) for the offshore wind farms “Hochsee Windpark Nordsee” and “He Dreiht” in the German North Sea consisting of up to 199 wind turbines


 
  • Projektdaten

    maximieren

    Bewerbungsschluss 02.10.2009, 12:00 Bewerbungsschluss
    Verfahren Verhandlungsverfahren
    Berufsgruppen Bauingenieurwesen, Architektur
    Gebäudetyp Technische Infrastruktur
    Sprache Englisch
    Aufgabe
    Execution of Front End Engineering Design Study (FEED Study) for the offshore wind farms “Hochsee Windpark Nordsee” and “He Dreiht” in the German North Sea consisting of up to 199 wind turbines. The two projects “Hochsee Windpark Nordsee” and “He Dreiht” shall be considered as one taking advantage of possible synergies and economies of scale throughout all phases of the projects

    Execution of Front End Engineering Design (FEED) Study as major input and basis for further project planning and investment decision for the offshore wind farms “Hochsee Windpark Nordsee” and “He Dreiht” in the German North Sea situated approx. 85 km north of the island of Borkum. Both wind farms contain 80 wind turbines each. As extension of He Dreiht there are currently a further 39 turbines sites in the consenting process. Together the wind farms will comprise a maximum of 199 wind turbines. Content of FEED-Study: — Set up and evaluation of several design concepts (park layout, type of foundation, concepts for platforms, installation procedures, maritime logistics, etc.) for selected wind turbine classes to assess viability of technical and commercial aspects. — Based upon professional modeling, reducing the complex matrix to a small number of recommended concepts and ranking those showing the best return on investment. — Consideration of Total Cost of Ownership: erection, operation, decommissioning (including risk analysis). — Identification of the risks and costs drivers as well as sensitivity analysis with regard to the project return. — Providing major input to the “Design Basis” according to the demands of “Standard – Design of offshore wind turbines” (BSH 2008) and “Standard – Ground investigations for offshore wind farms” (BSH 2007), both edited by Bundesamt fuer Seeschifffahrt und Hydrographie, BSH, Hamburg, such as optimized park lay out and preliminary design concepts for the wind turbine foundations and the offshore substation. Elaboration and recommendation of "design concepts" shall include but not be limited to the consideration / optimization of: — Wind turbine type. — Micrositing: Park layout and energy yield. — Foundation type. — Concept and design for platform and substation. — Installability: Vessels, port layout, etc. — Inter array grid and interface to export grid owner (Transpower). — Operation and Maintenance incl. among others evaluation of crew transfer concept (vessel types, helicopter transport, accommodation platform, harbors) and maintainability of wind farm components. — Health and Safety, Quality and Certification issues. — Main market drivers as input to Procurement strategy. Employer requires high degree of transparency during all steps of the work, especially during modeling and description of evaluation criteria. Close interaction with Employer’s offshore experts is essential. Delivery dates: Results as Input for Design Basis: Q2/2010. Results as basis for procurement strategy and investment decision Q3/2010.
    Leistungsumfang
    The scope of contract covers the execution of a Front End Engineering Design study for the offshore wind farms “Hochsee Windpark Nordsee” and “He Dreiht” in the North German North Sea consisting of up to 199 wind turbines. Estimated value excluding VAT: Range: between 750 000,00 and 1 500 000,00 EUR.
    Projektadresse DE-70567 Stuttgart
    Projektadresse DE-Nordsee
    TED Dokumenten-Nr. 245897-2009

  • Anzeigentext Ausschreibung

    maximieren

    • BEKANNTMACHUNG – SEKTOREN Dienstleistungsauftrag

      ABSCHNITT I: AUFTRAGGEBER

      I.1) NAME, ADRESSEN UND KONTAKTSTELLE(N): EnBW Systeme Infrastruktur Support GmbH, c/o EnBW Systeme Infrastruktur Support GmbH, Schelmenwasenstraße 15, z. Hd. von Steffen Bausinger, D-70567 Stuttgart. Tel. +49 71128983756. E-Mail: MjE2Yx5SUWVjWV5XVWIwVV5SZx5TX10=. Fax +49 7216319642. Weitere Auskünfte erteilen: EnBW Erneuerbare Energien GmbH, Airport-Center Hamburg, Flughafenstraße 52a, Haus C, z. Hd. von Mr. Frank Severit, D-22335 Hamburg. Tel. +49 40533268131. E-Mail: MjE5UxtgUmNSX1ZhLVJbT2QbUFxa. Fax +49 40533268200. URL: www.enbw.com. Verdingungs-/Ausschreibungs- und ergänzende Unterlagen (einschließlich Unterlagen für ein dynamisches Beschaffungssystem) sind erhältlich bei: den oben genannten Kontaktstellen. Angebote/Anträge auf Teilnahme sind zu richten an: EnBW Systeme Infrastruktur Support GmbH, c/o EnBW Systeme Infrastruktur Support GmbH, Schelmenwasenstraße 15, z. Hd. von Steffen Bausinger, D-70567 Stuttgart. Tel. +49 71128983756. E-Mail: MjIwXxpOTWFfVVpTUV4sUVpOYxpPW1k=. Fax +49 7216319642. URL: www.enbw.com.

      ABSCHNITT II: AUFTRAGSGEGENSTAND

      II.1) BESCHREIBUNG

      II.1.6) Gemeinsames Vokabular für öffentliche Aufträge (CPV): 71311000, 71241000, 71350000. Beschreibung: Beratung im Tief- und Hochbau. Durchführbarkeitsstudie, Beratung, Analyse. Wissenschaftliche und technische Dienstleistungen im Ingenieurwesen.

      ABSCHNITT IV: VERFAHREN

      IV.3) VERWALTUNGSINFORMATIONEN

      IV.3.3) Bedingungen für die Aushändigung von Verdingungs-/Ausschreibungs- und ergänzenden Unterlagen:

      IV.3.4) Schlusstermin für den Eingang der Angebote bzw. Anträge auf Teilnahme: 2.10.2009 - 12:00.

      IV.3.5) Sprache(n), in der (denen) Angebote oder Anträge auf Teilnahme verfasst werden können: Englisch.



      CONTRACT NOTICE –
      UTILITIES Services SECTION I: CONTRACTING ENTITY

      I.1) NAME, ADDRESSES AND CONTACT POINT(S): EnBW Systeme Infrastruktur Support GmbH, c/o EnBW Systeme Infrastruktur Support GmbH, Schelmenwasenstraße 15, Attn: Steffen Bausinger, D-70567 Stuttgart. Tel. +49 71128983756. E-mail: MTZtKFxbb21jaGFfbDpfaFxxKF1pZw==. Fax +49 7216319642. Further information can be obtained at: EnBW Erneuerbare Energien GmbH, Airport-Center Hamburg, Flughafenstraße 52a, Haus C, Attn: Mr. Frank Severit, D-22335 Hamburg. Tel. +49 40533268131. E-mail: MTVhKW5gcWBtZG87YGldcileamg=. Fax +49 40533268200. URL: www.enbw.com. Specifications and additional documents (including documents for a dynamic purchasing system) can be obtained at: As in above-mentioned contact point(s). Tenders or requests to participate must be sent to: EnBW Systeme Infrastruktur Support GmbH, c/o EnBW Systeme Infrastruktur Support GmbH, Schelmenwasenstraße 15, Attn: Steffen Bausinger, D-70567 Stuttgart. Tel. +49 71128983756. E-mail: MjEyZyJWVWlnXWJbWWY0WWJWayJXY2E=. Fax +49 7216319642. URL: www.enbw.com.

      I.2) MAIN ACTIVITY OR ACTIVITIES OF THE CONTRACTING ENTITY: Electricity.
      SECTION II: OBJECT OF THE CONTRACT

      II.1) DESCRIPTION

      II.1.1) Title attributed to the contract by the contracting entity: Execution of Front End Engineering Design Study (FEED Study) for the offshore wind farms “Hochsee Windpark Nordsee” and “He Dreiht” in the German North Sea consisting of up to 199 wind turbines. The two projects “Hochsee Windpark Nordsee” and “He Dreiht” shall be considered as one taking advantage of possible synergies and economies of scale throughout all phases of the projects.

      II.1.2) Type of contract and location of works, place of delivery or of performance: Services. Service category: No 12. Main place of performance: North Sea, Schleswig-Holstein, Germany. NUTS code: DEF0.

      II.1.5) Short description of the contract or purchase(s): Execution of Front End Engineering Design (FEED) Study as major input and basis for further project planning and investment decision for the offshore wind farms “Hochsee Windpark Nordsee” and “He Dreiht” in the German North Sea situated approx. 85 km north of the island of Borkum. Both wind farms contain 80 wind turbines each. As extension of He Dreiht there are currently a further 39 turbines sites in the consenting process. Together the wind farms will comprise a maximum of 199 wind turbines. Content of FEED-Study: — Set up and evaluation of several design concepts (park layout, type of foundation, concepts for platforms, installation procedures, maritime logistics, etc.) for selected wind turbine classes to assess viability of technical and commercial aspects. — Based upon professional modeling, reducing the complex matrix to a small number of recommended concepts and ranking those showing the best return on investment. — Consideration of Total Cost of Ownership: erection, operation, decommissioning (including risk analysis). — Identification of the risks and costs drivers as well as sensitivity analysis with regard to the project return. — Providing major input to the “Design Basis” according to the demands of “Standard – Design of offshore wind turbines” (BSH 2008) and “Standard – Ground investigations for offshore wind farms” (BSH 2007), both edited by Bundesamt fuer Seeschifffahrt und Hydrographie, BSH, Hamburg, such as optimized park lay out and preliminary design concepts for the wind turbine foundations and the offshore substation. Elaboration and recommendation of "design concepts" shall include but not be limited to the consideration / optimization of: — Wind turbine type. — Micrositing: Park layout and energy yield. — Foundation type. — Concept and design for platform and substation. — Installability: Vessels, port layout, etc. — Inter array grid and interface to export grid owner (Transpower). — Operation and Maintenance incl. among others evaluation of crew transfer concept (vessel types, helicopter transport, accommodation platform, harbors) and maintainability of wind farm components. — Health and Safety, Quality and Certification issues. — Main market drivers as input to Procurement strategy. Employer requires high degree of transparency during all steps of the work, especially during modeling and description of evaluation criteria. Close interaction with Employer’s offshore experts is essential. Delivery dates: Results as Input for Design Basis: Q2/2010. Results as basis for procurement strategy and investment decision Q3/2010.

      II.1.6) Common procurement vocabulary (CPV): 71311000, 71241000, 71350000.

      II.1.7) Contract covered by the Government Procurement Agreement (GPA): No.

      II.1.8) Division into lots: No.

      II.1.9) Variants will be accepted: No.

      II.2) QUANTITY OR SCOPE OF THE CONTRACT

      II.2.1) Total quantity or scope: The scope of contract covers the execution of a Front End Engineering Design study for the offshore wind farms “Hochsee Windpark Nordsee” and “He Dreiht” in the North German North Sea consisting of up to 199 wind turbines. Estimated value excluding VAT: Range: between 750 000,00 and 1 500 000,00 EUR.

      II.2.2) Options: No.
      SECTION III: LEGAL, ECONOMIC, FINANCIAL AND TECHNICAL INFORMATION

      III.1) CONDITIONS RELATING TO THE CONTRACT

      III.1.1) Deposits and guarantees required: As per invitation to bid.

      III.1.2) Main financing conditions and payment arrangements and/or reference to the relevant provisions regulating them: As per invitation to bid.

      III.1.4) Other particular conditions to which the performance of the contract is subject: Yes. The execution of this contract is restricted to parties that can prove experience in the execution and methodology of FEED studies for offshore wind parks.

      III.2) CONDITIONS FOR PARTICIPATION

      III.2.2) Economic and financial capacity: a) Corporate ownership and parent company.
      b) Last 3 financial years' turn over, EBIT and number of employees - in total as well as for the respective division.
      c) Information on providing securities for prepayments and warranties.

      III.2.3) Technical capacity: Information and formalities necessary for evaluating if requirements are met: III.2.3.1: Project reference list proving experience in the execution / coordination of FEED studies for offshore wind parks. III.2.3.2: Project reference list proving experience in the design work for foundations of offshore wind parks. III.2.3.3: Project reference list proving experience in the design work for cabling and the offshore substation of offshore wind parks. III.2.3.4: For each reference at least the following information has to be provided: (customer, contact person, year of contract award, year of operations start-up, contract volume in Euro, scope of work). III.2.3.5: Proof that bidder is capable to carry out the FEED study in accordance with all relevant standards and can offer the scope of services. III.2.3.6: Proof of having the resources to perform the specified work (size of the respective department and staff skills/qualifications/involvement in other FEED studies or design works). III.2.3.7: Proof of having ability to exercise an adequate documentation management system and provide reporting on progress to the employer. III.2.3.8: Specification of standards and codes that are relevant to the FEED study. III.2.3.9: Proposed schedule for the execution of the study. III.2.3.10: If it is neccessary for the bidder/bidding consortium to resort to other sources/subcontractors in order to prove their performance ability, the relevant declarations and certificates from the third parties/subcontractors have to be provided (minimum requirements).

      III.2.4) Reserved contracts: No.

      III.3) CONDITIONS SPECIFIC TO SERVICES CONTRACTS

      III.3.1) Execution of the service is reservedto a particular profession: No.

      III.3.2) Legal persons should indicate the names and professional qualifications of the staff responsible for the execution of the service: No.
      SECTION IV: PROCEDURE

      IV.1) TYPE OF PROCEDURE

      IV.1.1) Type of procedure: Negotiated Candidates have already been selected: no.

      IV.2) AWARD CRITERIA

      IV.2.1) Award criteria: The most economically advantageous tender in terms of the criteria stated below
      1. Price / Commercial Conditions. Weighting: 25.
      2. Experiences and references of bidder. Weighting: 35.
      3. Methodology. Weighting: 25.
      4. Project management / Document Control / Communication with Employer. Weighting: 15.

      IV.2.2) An electronic auction will be used: No.

      IV.3) ADMINISTRATIVE INFORMATION

      IV.3.2) Previous publication concerning the same contract: No.

      IV.3.3) Conditions for obtaining specifications and additional documents: Payable documents: no.

      IV.3.4) Time limit for receipt of tenders or requests to participate: 2.10.2009 - 12:00.

      IV.3.5) Language(s) in which tenders or requests to participate may be drawn up: English.
      SECTION VI: COMPLEMENTARY INFORMATION

      VI.1) THIS IS A RECURRENT PROCUREMENT: No.

      VI.2) CONTRACT(S) RELATED TO A PROJECT AND/OR PROGRAMME FINANCED BY COMMUNITY FUNDS: No.

      VI.3) ADDITIONAL INFORMATION: The contract of the deliveries and services described in this announcement will be placed under reserve of the approval of the corresponding employer's board (board's reservation). We will be glad to receive your proof of compliance to the requirements stated in III.2 Conditions for Participation. The requests to participate shall be transferred in electronical (PDF) and paper form to: EnBW Systeme Infrastruktur Support GmbH. Einkauf und Logistik. Herr Steffen Bausinger. Schelmenwasenstraße 15. 70567 Stuttgart mailto: MjExaCNXVmpoXmNcWmc1WmNXbCNYZGI= In addition, the request to participate shall be transfered in electronical form to: Frank Severit mailto: MjEwXCRpW2xbaF9qNltkWG0kWWVj.

      VI.4) PROCEDURES FOR APPEAL

      VI.4.1) Body responsible for appeal procedures: Vergabekammer Baden-Württemberg, beim Landesgewerbeamt Baden-Württemberg Willi-Bleicher-Str. 19, D-70174 Stuttgart.

      VI.5) DATE OF DISPATCH OF THIS NOTICE: 1.9.2009.
    © European Union, http://ted.europa.eu
  • Protected by Copyscape
  • Gewährleistung

    competitionline übernimmt keine Verantwortung für Fehler, Auslassungen, Unterbrechungen, Löschungen, Mängel oder Verzögerungen im Betrieb oder bei Übertragung von Inhalten. competitionline übernimmt keine Verantwortung für Einbußen oder Schäden, die aus der Verwendung der Internetseiten, aus der Verwendung von Nutzerinhalten oder von Inhalten Dritter, die aus den Internetseiten oder über den Service gepostet oder an Nutzer übertragen werden, oder aus Interaktionen zwischen Nutzer und Internetseiten (online oder offline) resultieren. Bitte lesen Sie hierzu unsere Nutzungsbedingungen.


INFO-BOX

Ausschreibung veröffentlicht 04.09.2009
Zuletzt aktualisiert 04.09.2009
Wettbewerbs-ID 2-24648 Status Kostenpflichtig
Seitenaufrufe 1663