Design and Construction of Slieve Bloom Mountain Bike Trail Centre (Phase 1) in Co. Offaly and Laois.


 
  • Projektdaten

    maximieren

    Bewerbungsschluss 04.12.2017, 15:00 Bewerbungsschluss
    Verfahren Offenes Verfahren
    Gebäudetyp Verkehr
    Art der Leistung Bauleistung / allgemeine Beratungsleistungen / sonstige / Objektplanung Verkehrsanlagen
    Sprache Englisch
    Aufgabe
    To access the Qualification Questionnaire please log on to (http://www.coillte.ie/) go to Suppliers — click on SMS link to access Coillte's Supplier Management System (SMS) or click on the direct link below;
    https://supplierlive.proactisp2p.com/Account/Login
    The first phase (to which this PQQ and subsequent tender applies) will design and build approximately 27 kms of singletrack non-bitmac mountain bike trails and these will link with a further 8 kms of existing forest roads to provide a total of 35 kms of trail network.
    Leistungsumfang
    To access the Qualification Questionnaire please log on to (http://www.coillte.ie/) go to Suppliers — click on SMS link to access Coillte's Supplier Management System (SMS) or click on the direct link below;
    https://supplierlive.proactisp2p.com/Account/Login
    The mountain-bike trail network when completed will comprise of more than 100 kms of trails in the Slieve Bloom Mountains and was granted planning permission by Laois and Offaly County Councils in March 2017. It is centred on 2 trailheads, 1 near/in Kinnitty village in Co. Offaly and 1 in the heart of the Baunreagh valley, Co. Laois.
    The first phase (to which this PQQ and subsequent tender applies) will design and build approximately 27 kms of singletrack non-bitmac mountain bike trails and these will link with a further 8 kms of existing forest roads to provide a total of 35 kms of trail network. The first phase will build trails centred at both trailheads and both will be connected via the public road over the county boundary. The first phase will also include the construction of rural public road crossings, a footbridge, hard standing for car-parking and installation of signage and waymarking.
    The macro-design carried out to date for the trail network has identified suitable trail corridors for each trail section, within which the definitive trail line will be designed and built. The corridors are up to a maximum of 100 m width and the trail construction zone will be a maximum of 5 m width within that corridor. The finished trail surface will be no more than 600 mm width within that trail construction zone (unless otherwise specified).
    Adresse des Bauherren IE-Wicklow
    TED Dokumenten-Nr. 442699-2017

  • Anzeigentext Ausschreibung

    maximieren

    •  

      Ireland-Wicklow: Engineering works and construction works

      2017/S 213-442699

      Contract notice

      Services

      Directive 2014/24/EU

      Section I: Contracting authority

      I.1)Name and addresses
      Coillte CGA
      Newtownmountkennedy, Co. Wicklow
      Wicklow
      Ireland
      Contact person: Sinead Cronin
      Telephone: +353 871349072
      E-mail: 
      MjEyZ11iWVVYIldmY2JdYjRXY11gYGhZIl1Z
      NUTS code: IE

      Internet address(es):

      Main address: www.coillte.ie

      Address of the buyer profile: https://irl.eu-supply.com/ctm/Company/CompanyInformation/Index/159

      I.2)Joint procurement
      I.3)Communication
      The procurement documents are available for unrestricted and full direct access, free of charge, at: https://supplierlive.proactisp2p.com/Account/Login
      Additional information can be obtained from the abovementioned address
      Tenders or requests to participate must be submitted electronically via: http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=120943&B=ETENDERS_SIMPLE
      Tenders or requests to participate must be submitted to the abovementioned address
      I.4)Type of the contracting authority
      Body governed by public law
      I.5)Main activity
      Other activity: forestry

      Section II: Object

      II.1)Scope of the procurement
      II.1.1)Title:

       

      Design and Construction of Slieve Bloom Mountain Bike Trail Centre (Phase 1) in Co. Offaly and Laois.

       

      Reference number: Coillte
      II.1.2)Main CPV code
      45220000
      II.1.3)Type of contract
      Services
      II.1.4)Short description:

       

      To access the Qualification Questionnaire please log on to (http://www.coillte.ie/) go to Suppliers — click on SMS link to access Coillte's Supplier Management System (SMS) or click on the direct link below;

      https://supplierlive.proactisp2p.com/Account/Login

      The first phase (to which this PQQ and subsequent tender applies) will design and build approximately 27 kms of singletrack non-bitmac mountain bike trails and these will link with a further 8 kms of existing forest roads to provide a total of 35 kms of trail network.

       

      II.1.5)Estimated total value
      Value excluding VAT: 1 100 000.00 EUR
      II.1.6)Information about lots
      This contract is divided into lots: no
      II.2)Description
      II.2.1)Title:
      II.2.2)Additional CPV code(s)
      45200000
      71311000
      71311100
      71322000
      98350000
      II.2.3)Place of performance
      NUTS code: IE
      Main site or place of performance:

       

      County Offaly/Laois.

       

      II.2.4)Description of the procurement:

       

      To access the Qualification Questionnaire please log on to (http://www.coillte.ie/) go to Suppliers — click on SMS link to access Coillte's Supplier Management System (SMS) or click on the direct link below;

      https://supplierlive.proactisp2p.com/Account/Login

      The mountain-bike trail network when completed will comprise of more than 100 kms of trails in the Slieve Bloom Mountains and was granted planning permission by Laois and Offaly County Councils in March 2017. It is centred on 2 trailheads, 1 near/in Kinnitty village in Co. Offaly and 1 in the heart of the Baunreagh valley, Co. Laois.

      The first phase (to which this PQQ and subsequent tender applies) will design and build approximately 27 kms of singletrack non-bitmac mountain bike trails and these will link with a further 8 kms of existing forest roads to provide a total of 35 kms of trail network. The first phase will build trails centred at both trailheads and both will be connected via the public road over the county boundary. The first phase will also include the construction of rural public road crossings, a footbridge, hard standing for car-parking and installation of signage and waymarking.

      The macro-design carried out to date for the trail network has identified suitable trail corridors for each trail section, within which the definitive trail line will be designed and built. The corridors are up to a maximum of 100 m width and the trail construction zone will be a maximum of 5 m width within that corridor. The finished trail surface will be no more than 600 mm width within that trail construction zone (unless otherwise specified).

       

      II.2.5)Award criteria
      Price is not the only award criterion and all criteria are stated only in the procurement documents
      II.2.6)Estimated value
      Value excluding VAT: 1 100 000.00 EUR
      II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
      Duration in months: 7
      This contract is subject to renewal: no
      II.2.10)Information about variants
      Variants will be accepted: no
      II.2.11)Information about options
      Options: no
      II.2.12)Information about electronic catalogues
      Tenders must be presented in the form of electronic catalogues or include an electronic catalogue
      II.2.13)Information about European Union funds
      The procurement is related to a project and/or programme financed by European Union funds: no
      II.2.14)Additional information

       

      The first phase (to which this PQQ and subsequent tender applies) will design and build approximately 27 kms of singletrack non-bitmac mountain bike trails and these will link with a further 8 kms of existing forest roads to provide a total of 35 kms of trail network.

       

      Section III: Legal, economic, financial and technical information

      III.1)Conditions for participation
      III.1.1)Suitability to pursue the professional activity, including requirements relating to enrolment on professional or trade registers
      III.1.2)Economic and financial standing
      III.1.3)Technical and professional ability
      III.1.5)Information about reserved contracts
      III.2)Conditions related to the contract
      III.2.1)Information about a particular profession
      III.2.2)Contract performance conditions:
      III.2.3)Information about staff responsible for the performance of the contract

      Section IV: Procedure

      IV.1)Description
      IV.1.1)Type of procedure
      Open procedure
      IV.1.3)Information about a framework agreement or a dynamic purchasing system
      IV.1.4)Information about reduction of the number of solutions or tenders during negotiation or dialogue
      IV.1.6)Information about electronic auction
      IV.1.8)Information about the Government Procurement Agreement (GPA)
      The procurement is covered by the Government Procurement Agreement: no
      IV.2)Administrative information
      IV.2.1)Previous publication concerning this procedure
      IV.2.2)Time limit for receipt of tenders or requests to participate
      Date: 04/12/2017
      Local time: 15:00
      IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
      IV.2.4)Languages in which tenders or requests to participate may be submitted:
      English
      IV.2.6)Minimum time frame during which the tenderer must maintain the tender
      IV.2.7)Conditions for opening of tenders
      Date: 04/12/2017
      Local time: 15:00

      Section VI: Complementary information

      VI.1)Information about recurrence
      This is a recurrent procurement: no
      VI.2)Information about electronic workflows
      Electronic invoicing will be accepted
      Electronic payment will be used
      VI.3)Additional information:
      VI.4)Procedures for review
      VI.4.1)Review body
      Coillte
      Cavan
      Ireland
      E-mail: 
      MThrYWZdWVwmW2pnZmFmOFtnYWRkbF0mYV0=
      VI.4.2)Body responsible for mediation procedures
      VI.4.3)Review procedure
      VI.4.4)Service from which information about the review procedure may be obtained
      VI.5)Date of dispatch of this notice:
      03/11/2017
    © European Union, http://ted.europa.eu
  • Protected by Copyscape
  • Gewährleistung

    competitionline übernimmt keine Verantwortung für Fehler, Auslassungen, Unterbrechungen, Löschungen, Mängel oder Verzögerungen im Betrieb oder bei Übertragung von Inhalten. competitionline übernimmt keine Verantwortung für Einbußen oder Schäden, die aus der Verwendung der Internetseiten, aus der Verwendung von Nutzerinhalten oder von Inhalten Dritter, die aus den Internetseiten oder über den Service gepostet oder an Nutzer übertragen werden, oder aus Interaktionen zwischen Nutzer und Internetseiten (online oder offline) resultieren. Bitte lesen Sie hierzu unsere Nutzungsbedingungen.


INFO-BOX

Ausschreibung veröffentlicht 07.11.2017
Zuletzt aktualisiert 07.11.2017
Wettbewerbs-ID 2-283109 Status Kostenpflichtig
Seitenaufrufe 89