The procurement is divided into the following sub areas:
A: Architectural and consulting engineering services.
— Sub Area A1: Consulting construction engineer (RIB),
— Sub Area A2: Consulting HVAC and sanitary installations engineer (RIV),
— Sub Area A3: Consulting Electrical Engineer (RIE),
— Sub Area A4: Consulting Fire Engineer (RIBr),
— Sub Area A5: Architect (ARK),
— Sub Area A6: Landscape Architect (LARK),
— Sub Area A7: Interior Architect (IARK),
— Sub Area A8: Consulting Acoustic Engineer (RIAKU),
— Sub Area A9: Consulting Geotechnical Engineer (RIG),
— Sub Area A10: Environmental Mapping,
— Sub Area A11: SHA Coordinator B: Projective Administrative Services,
— Sub Area B1: Project Management (PL),
— Sub Area B2: Construction Management (BL)C: Special consultants (other technical services),
— Sub Area C1: BIM (Building Information Modelling) Consultant,
— Sub Area C2: ITB (Integrated Technical Building Installations) integrator,
— Sub Area C3: Calculation/economic calculation. Each of the sub areas is divided into lots. See the Tender documentation Annex 1 — overview of the lots for further information.